Wembley Manor School

Spread across three storey’s consisting of 121 modular units, all manufactured and installed by our client Reds10.

Project details

  • The school provides 150 specialist places for local children

  • Modern classrooms were decorated with a bright finish to support learning and wellbeing

  • The project has set new standards for sustainability with environmental factors closely monitored through BREEAM

Jasmine White was used throughout the building on the walls, a popular choice for schools –opening up the space, filling it with light and calm, creating the perfect learning environment for the students.

‘This project was not without its challenges, working to a tight programme and numerous detail changes the team delivered on the expected high standards’

Dean Thomas – Intertech Director (Operations Lead)

Statistics

  • 3,801 m2

  • 121 modular units decorated

  • Tape joint and decoration works carried out at Driffield then on site in Wembley

  • 516 litres of paint used